HP Integrity cx2600 Installation Instructions Manual page 6

Server mount kit for 19 in. 2-post rack
Hide thumbs Also See for Integrity cx2600:
Table of Contents

Advertisement

HP Server Mount Kit for 19 in. 2-Post Rack Installation Instructions
Mounting the Server with Chassis Front Aligned with Rack Posts
Figure 1-3Attach Kit Hardware to Rack Columns – Front Mount
T25 10-32 Screws
Cable Management Bar
Step 2. Install the 10-32 nut clips on the tray (base) where the bracket mounting screws will be installed.
Step 3. From the front of the rack, slide the server chassis onto the tray (base), with the chassis rack ears
against the rack columns. Attach the rack ears to the columns with T25 10-32 or 12-24 panhead
screws, lockwashers, and #12 flatwashers.
Figure 1-4Attach Server Rack Ears to Rack Columns – Front Mount
T25 10-32 or
12-24 Screws
Step 4. Loosely attach the chassis brackets to each side of the server chassis with T15 screws and plated
flatwashers. Attach the rack brackets to the tray (base) with T25 10-32 screws. Then tighten all
screws.
Step 5. Attach the cable management strain relief bar to the brackets with T25 10-32 screws. (See
Figure 1-3.)
6
Tray
Nut Clips
2pfrthrd
2pfrtmnt2
(View from Front)
(View from Rear)
T25 10-32 or
12-24 Screws
Nut Clips
Bracket
Bracket
T15 Screws
Tray
Rack Ear
Chapter 1

Advertisement

Table of Contents
loading

This manual is also suitable for:

Ab292a

Table of Contents