Download Print this page

HP Carrier-grade cc2300 Installation Instructions Manual page 4

Processor installation and replacement procedure for the hp cc3310 carrier grade server
Hide thumbs Also See for Carrier-grade cc2300:

Advertisement

5. Aligning the raised metal surfaces, place the heat sink on top of the processor.
Figure D
Installing the Heat Sink
6. Place the heat sink clip so the tab on the clip engages the slot on the heat sink. Position
the clip so that the plastic tab on the retaining bracket in located in the narrow portion of
the heat sink clip opening. (See A in Figure E)
7. Press one end of the clip down until it locks into position with the retainer block tab. The
black plastic tab should protrude through the opening in end of the heat sink clip. Some
slight sideways movement of the clip may be necessary to achieve proper installation.
(See B in Figure E)
8. Press the other end of the clip down until it locks in position with the retainer block tab.
Again some slight sideways movement of the clip may be necessary to achieve proper
installation. (See C in Figure E)
9. Reassemble the system after these steps are done. At this point, power can be reapplied
to the system. Be sure to reprogram the SDR, as detailed in the "Important Note" at the
beginning of this procedure.

Advertisement

loading

This manual is also suitable for:

Carrier-grade cc3300Cc3310