HP 6125XLG Command Reference Manual page 7

Blade switch trill command reference
Table of Contents

Advertisement

network-operator
Examples
# Display GR status information about TRILL.
<Sysname> display trill graceful-restart status
Restart status: RESTARTING
Restart phase: LSDB synchronization
Restart interval: 300s
T3 remaining time: 140s
Total number of interfaces: 1
Number of waiting LSPs: 3
T2 remaining time: 55s
Interface: FortyGigE1/1/1
T1 remaining time: 2s
RA received: Y
CSNP received: N
T1 expiration number: 1
Table 4 Command output
Field
Restart status
Restart phase
Restart interval
T3 remaining time
Total number of interfaces
T2 remaining time
Interface
T1 remaining time
RA received
Description
Restart status:
COMPLETE—GR is complete.
RESTARTING—GR of the Restart type is in process.
STARTING—GR of the Start type is in process.
Restart phase:
Finish—GR is complete.
LSDB synchronization—T2 synchronization phase.
LSDB generation—LSP generation phase.
MCS synchronization—Layer 2 multicast data synchronization phase.
SPF—Route calculation phase.
Restart interval (in seconds).
Remaining time of the T3 timer (in seconds). The initial value is 65535 seconds,
and is updated according to the remaining time in the RA packet.
Total number of interfaces in the process.
Remaining time of the T2 timer (in seconds). The initial value of the field is fixed
at 60 seconds for GR of the Restart type and is the value (300 seconds by
default) set by using the graceful-restart interval command for GR of the Start
type.
Port name.
Remaining time of the T1 timer (in seconds). The initial value of the field is 3
seconds.
RA received flag bit:
Y—Set.
N—Not set.
4

Advertisement

Table of Contents
loading

Table of Contents