12
Ensure the following is completed after the boiler has been installed and commissioned:-
BOILER SERIAL No. ......................................................... NOTIFICATION No. ..........................................................
CONTROLS
To comply with the Building Regulations, each section must have a tick in one or other of the boxes
Time & temperature control to heating
Time & temperature control to hot water
Heating zone valves
Hot water zone valves
Thermostatic radiator valves
Automatic by-pass to system
FOR ALL BOILERS CONFIRM THE FOLLOWING:
The system has been flushed in accordance with the boiler manufacturer's instructions?
The system cleaner used ....................................................................................................................
The inhibitor used ................................................................................................................................
FOR CENTRAL HEATING MODE, MEASURE AND RECORD THE FOLLOWING:
Gas rate
Burner operating pressure (if applicable)
Central heating flow temperature
Central heating return temperature
FOR COMBINATION BOILERS ONLY
Has a water scale reducer been fitted?
What type of scale reducer has been fitted? ......................................................................................
FOR DOMESTIC HOT WATER MODE, MEASURE AND RECORD THE FOLLOWING:
Gas rate
Maximum burner operating pressure (if applicable)
Cold water inlet temperature
Hot water outlet temperature
Water flow rate
FOR CONDENSING BOILERS ONLY CONFIRM THE FOLLOWING:
The condensate drain has been installed in accordance with the manufacturer's instructions?
FOR ALL INSTALLATIONS CONFIRM THE FOLLOWING:
The heating and hot water system complies with current Building Regulations
The appliance and associated equipment has been installed and commissioned
in accordance with the manufacturer's instructions
If required by the manufacturer, have you recorded a CO/CO
The operation of the appliance and system controls have been demonstrated to the customer
The manufacturer's literature has been left with the customer
COMMISSIONING ENG'S NAME:
Print ...................................................................... CORGI ID No. ..................................................
Sign ...................................................................... Date .................................................................
Alpha CD24C/32C - Benchmark Checklist
38
CHECKLIST
room t/stat & programmer/timer
cylinder t/stat & programmer/timer
Fitted
Fitted
Fitted
Fitted
ratio reading
N/A
2
Programmable roomstat
Combi boiler
Not required
Not required
Not required
Yes
No
m³/hr
ft³/hr
N/A
mbar
°C
°C
Yes
No
m³/hr
ft³/hr
N/A
mbar
°C
°C
lts/min
Yes
Yes
Yes
Yes
CO/CO
Yes
Yes
ratio
2
Need help?
Do you have a question about the Alpha CD24C and is the answer not in the manual?
Questions and answers