Alpha CD Easy-Flue Series Installation Instructions Manual

With plume management facility

Advertisement

Quick Links

Installation Instructions
(with Plume Management Facility)
CD Easy-Flue 500 mm
CD Easy-Flue 1000 mm Part No. 6.2001010
60/100 concentric flue for use with
Alpha CD range of condensing boilers
EN 14471
Alpha CD Easy-Flue
For Technical help or for Service call ...
ALPHA HELPLINE Tel: 0844 8718764
website:www.alpha-innovation.co.uk
Nepicar House, London Road,
Wrotham Heath, Sevenoaks,
Kent TN15 7RS
Part No. 6.2000510

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the CD Easy-Flue Series and is the answer not in the manual?

Questions and answers

Summary of Contents for Alpha CD Easy-Flue Series

  • Page 1 CD Easy-Flue 500 mm Part No. 6.2000510 CD Easy-Flue 1000 mm Part No. 6.2001010 60/100 concentric flue for use with Alpha CD range of condensing boilers For Technical help or for Service call ... ALPHA HELPLINE Tel: 0844 8718764 website:www.alpha-innovation.co.uk...
  • Page 2 GENERAL Note: These flues MUST ONLY be used with the Alpha Condensing boilers. The Alpha Easy-Flue is suitable for straight horizontal flues only and can be extended up to the maximum lengths given in Section 4. The Alpha CD Easy-Flue is suitable for providing two options for management of the exhaust flue gas/plume emitted from the terminal.
  • Page 3 INSTALL THE BOILER Fit the boiler in accordance with the installation instructions supplied with the Alpha condensing boiler - Sections 4.1 to 4.5. Use the template (supplied with the boiler) to mark the flue position and cut a 110 mm diameter flue hole (or use a 107 mm core drill).
  • Page 4 This is when the extended flue is passed through the wall. Subtract 45 mm if Premier Pack is used Additional support brackets are required when extending the flue. These are available from Alpha, Part no. 6.1000355.
  • Page 5 Use the template (supplied with the boiler) to mark the required flue position, ensuring there is the correct slope towards the boiler. Determine the overall flue length as described in Section 3, paragraph (a) to determine the number of Alpha CD 750 or 1000 mm flue extensions required.
  • Page 6 FIT PLUME MANAGEMENT COMPONENTS - (OPTIONAL) The following procedures detail the options for management of the exhaust flue gas/plume emitted from the terminal. The terminal supplied with the Easy-Flue can be altered to divert exhaust flue gas/plume at an angle. This can be achieved by simply turning the end section of the terminal to the desired angle.
  • Page 7 Note: The equivalent horizontal flue assembly length + the equivalent plume management length (PM length) must not exceed the maximum flue length stated for each boiler, i.e. Alpha CD boiler maximum equivalent flue length must not exceed 12 metres. Alpha HE boiler maximum equivalent flue length must not exceed 3 metres.
  • Page 8 These instructions have been carefully prepared but we reserve the right to Nepicar House, London Road, Wrotham Heath, alter the specification at any time in the interest of product improvement. Sevenoaks, Kent TN15 7RS © Alpha Therm Limited 2010. Tel: 0844 8718764 email: info@alpha-innovation.co.uk website:www.alpha-innovation.co.uk...

Table of Contents