8.30 CYCLONE - Fig. 13
1.
Gain access behind the casing and drain the boiler heating circuit as described in Sections 8.1 and 8.2.
2.
Disconnect the unions from the cyclone and re-assemble with a new cyclone.
3.
Pressurise the system. (Refer to Commissioning, Section 5.1).
8.31 CONDENSATE TRAP - Fig. 12
1.
Gain access behind the casing and drain the trap as described in Sections 8.1 and 7.3, paragraph 10.
2.
Disconnect the top and drain connection of the condensate trap.
Note: If access is difficult, remove the DHW heat exchanger as described in Section 8.25.
3.
Lift the trap out and re-assemble with a new condensate trap.
Note: Before fitting the new trap, pour 100 cc of water into the trap.
Alpha CD24C/32C - Component Replacement
30

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the Alpha CD24C and is the answer not in the manual?

Questions and answers

This manual is also suitable for:

Cd32c

Table of Contents

Save PDF