Install The Card - NEC N8403-018 User Manual

Fibre channel controller
Hide thumbs Also See for N8403-018:
Table of Contents

Advertisement

4-1. Install the Card

Install this product in the CPU Blade by following the steps below.
Avoid installation in extreme temperature conditions.
Immediately after the CPU Blade is powered off, its internal components such as hard
disks are very hot. Leave the server until its internal components fully cool down before
installing/removing any component.
Connect firmly.
Please connect the product to the CPU Blade firmly. A loose connection can cause a
contact failure and can lead to smoke or fire.
5.
Confirm that the power to the CPU Blade is off (power lamp off).
Important
6.
Remove the CPU Blade from the Blade Enclosure by following the instructions in the user's
manual of the CPU Blade.
7.
Install this product in the Mezzanine slot by following the instructions described in the user's
manual of the CPU Blade.
Check
8.
Secure the product to the spacer of the CPU Blade with the fixing screws.
If the power to the CPU Blade is on (power lamp on), shut down the
operating system and then turn off the CPU Blade.
The method of installing and removing and the location of the Mezzanine slot
differ among CPU Blades. Please read the user's manual of the CPU Blade for
more information.
If this product is not correctly connected to the Mezzanine slot of the CPU
Blade, remove the product and connect it again. Using excessive force can
lead to damage.
Connect this product to the proper Mezzanine slot for the FC through card or
the FC switch module. If this product is connected to an improper Mezzanine
slot, you cannot use a Fibre Channel device. Please check the proper location
by reading the user's manual of the CPU Blade, Blade Enclosure, and FC
through card or FC switch module.
CAUTION
- 32 -

Advertisement

Table of Contents
loading

Table of Contents