Install The Card - NEC N8403-034 User Manual

8g fibre channel controller
Table of Contents

Advertisement

4-1. Install the Card

Install this product in the CPU Blade following the steps described on the next step.
Avoid installation in extreme temperature conditions.
Immediately after the CPU Blade is powered off, its internal components such as hard
disks are very hot. Leave the server until its internal components fully cool down before
installing/removing any component.
Connect firmly.
Please connect the product to the CPU Blade firmly. A loose connection can cause a
contact failure and can lead to smoke or fire.
1.
Confirm the power to the CPU Blade is off (power lamp off).
Important
2.
Remove the CPU Blade from Blade Enclosure if necessary following the instructions in the
user's manual of the CPU Blade.
3.
Install this product in the Mezzanine slot as following the instructions described in the user's
manual of the CPU Blade.
Check
4.
Turn fixing screws and fix the product to the spacer of the CPU Blade.
If the power to the CPU Blade is on (power lamp on), shut down the
operating system and then turn off the CPU Blade.
The method of installing and removing the Mezzanine and the location of the
Mezzanine slot differ in different CPU Blades. Please read the user's manual of
the CPU Blade for confirmation.
If this product is not correctly connected to the Mezzanine slot of the CPU
Blade, remove the product and connect it again. Using excessive force can
lead to damage.
Connect this product to proper location Mezzanine slot to location of the FC
through card or the FC switch module. If this product connect to improper
location Mezzanine slot, cannot use Fibre Channel device. Please check
proper location with reading the user's manual of the CPU Blade and Blade
Enclosure and FC through card or FC switch module, for confirmation.
CAUTION
- 36 -

Advertisement

Table of Contents
loading

Table of Contents