Operation Procedure - Daikin FTQ18PAVJU Operation Manual

Split system air conditioner
Hide thumbs Also See for FTQ18PAVJU:
Table of Contents

Advertisement

6.

OPERATION PROCEDURE

Read the operation manual that came with
the remote controller.
To protect the unit, turn on the main power
switch 6 hours before operation.
If the main power supply is turned off during
operation, operation will restart automatically
after the power turns back on again.
Part name and functions
In case of vertical position.
1
2
3
4
In case of horizontal position.
3
5
4
6
English
9
8
7
6
5
2
9
8
1
7
1.
Airfl ow duct (local procurement)
2.
Power supply wiring and ground wire
through conduit
3.
Refrigerant piping
4.
Drain pipe
5.
Air inlet
6.
Remote controller
7.
Transmission wiring
8.
Connection wire
9.
Air outlet (local procurement)
COOLING, HEATING, AUTOMATIC, FAN,
AND PROGRAM DRY OPERATION
Operate in the following order.
1
OPERATION MODE SELECTOR
Press OPERATION MODE SELECTOR
button several times and select the
OPERATION MODE of your choice as
follows.
COOLING OPERATION ............................"
HEATING OPERATION .............................. "
AUTOMATIC OPERATION ........................."
In this operation mode, COOL/HEAT change-
over is automatically conducted.
FAN OPERATION ........................................ "
DRY OPERATION ....................................... "
The function of this program is to decrease the
humidity in your room with the minimum tem-
perature decrease.
Micro computer automatically determines
TEMPERATURE and FAN SPEED.
This system does not go into operation if the
room temperature is below 60°F.
Refer to fi gure 3 on page [1]
"
"
"
"
"
6

Advertisement

Table of Contents
loading

This manual is also suitable for:

Ftq24pavju

Table of Contents