HP ProCurve 2520G-PoE Series Installation And Getting Started Manual page 98

Table of Contents

Advertisement

Power LED ... 1-4
behavior during self test ... 2-8
behaviors ... 1-4
location on switch ... 1-3
power source
connecting the switch to ... 2-15
Power-over-Ethernet
PoE power ... 1-1
precautions
mounting the switch ... 2-3
power requirements ... 2-3
preparing the installation site ... 2-5
Proactive Network tools
diagnostics with ... 4-9
R
rack
mounting precautions ... 2-3
mounting the switch in ... 2-8
recycle statements ... D-1
regulatory statements ... B-8
Reset button
description ... 1-8
location on switch ... 1-3, 1-8
restoring factory default configuration ... 4-12
resetting the switch
factory default reset ... 4-12
location of Reset button ... 1-8
troubleshooting procedure ... 4-10
S
safety and regulatory statements ... B-1
safety specifications ... A-2
segment switch
sample topology ... 2-23
self test
Fault LED behavior ... 2-8
LED behavior during ... 2-8
Power LED behavior ... 2-8
Self Test LED ... 1-5
behavior during factory default reset ... 4-12
behavior during self test ... 2-8
serial cable
for direct console connection ... 2-21
SFP ports ... 1-2
4 – Index
slots for mini-GBICs
location on switch ... 1-3
specifications
acoustic ... A-2
electrical ... A-1
environmental ... A-1
physical ... A-1
safety ... A-2
straight-through cable
pin-out ... A-10, A-12
subnet mask
configuring ... 3-2
switch
connecting to a power source ... 2-15
description ... 1-1
downloading new software ... 4-13
electrical specifications ... A-1
environmental specifications ... A-1
features ... 1-10
front panel description ... 1-3
included parts ... 2-1
LED descriptions ... 1-4
mounting in a rack or cabinet ... 2-8
mounting on a wall ... 2-13
mounting on horizontal surface ... 2-14
physical specifications ... A-1
switch operation
verifying after installation ... 2-6
Switch Setup screen ... 3-2
configuring a subnet mask ... 3-2
configuring an IP address ... 3-2
field descriptions ... 3-3
T
Telnet access to the console ... 3-5
terminal configuration ... 2-20
testing
checking the console messages ... 4-10
checking the LEDs ... 4-10
diagnostic tests ... 4-10
end-to-end communications ... 4-11
link test ... 4-11
Ping test ... 4-11
switch operation ... 4-10
switch-to-device communications ... 4-11
twisted-pair cabling ... 4-11

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents