Verifying Installation; Where To Go Next - Cisco 805 Hardware Installation Manual

Hide thumbs Also See for 805:
Table of Contents

Advertisement

Verifying Installation

Verify the power, Ethernet, and serial connections by checking the LEDs. Table 2-3
describes the normal pattern for each LED and what to do if you get an abnormal pattern.
Table 2-3
LED
OK
LINK
CD
(Carrier
detect)
1
For information on how the setting of the router HUB/NO HUB button might be affected by the setting of an
equivalent hub button, see the "Connecting an Ethernet Device" section earlier in this chapter.
2
You must configure the serial interface before this LED turns on. For more information on configuring the
serial interface, see the Cyclone 805 Router Software Configuration Guide.

Where to Go Next

You have completed the hardware installation and are ready to configure the software.
Cisco strongly recommends that you use the Cisco 805 Fast Step software. Use the
Cisco 805 Fast Step CD-ROM that ships with the Cisco 805 router and Cisco 805 Fast Step
online help. If you decide to use the command-line interface (CLI) to configure the
software, refer to the Cisco 805 Router Software Configuration Guide.
Verifying Installation
Normal
Pattern
Explanation
On
Power is supplied to the
router. Router completes
self-test procedure and
begins operating.
On
(LINK LED is located on
router back panel.)
Ethernet device is connected.
On
Serial interface is up, and
carrier signal is detected.
If Abnormal Pattern
If off, refer to Chapter 3,
"Troubleshooting."
If off, toggle the HUB/NO HUB button (if
set to HUB [in], reset to NO HUB [out] or
1
vice versa).
If still off, refer to Chapter 3,
"Troubleshooting."
If off for a long time, refer to Chapter 3,
2
"Troubleshooting."
Installing the Cisco 805 Router 2-17
Verifying Installation

Advertisement

Table of Contents
loading

Table of Contents