GE ASH08 Owner's Manual & Installation Instructions page 15

Table of Contents

Advertisement

Through-the-WallInstallation Instructions--Optional.
The case may be installed throughthe wall in bothexisting and new construction.
Read completely, then follow step-by-step.
IMPORTANT
Through-the-wall installation is not appropriate
if any of the side louvers in the case will be
obstructed by the wall.
All side louvers in the case must project on the
outdoor side of the wall.
The roomside of the case mustproject into the
roomat least 13/4 " fromthe finished wall.
The case mustbe installed level from side-to-side
and with a slight tilt from front to roar. Usea level;
abouta I/2 bubblewill be the correctcaseslant to
the outside.
_]
Remo',e
the air conditioner
frmn
the case.
For specific
instH/ction,
refer
to the Window
Installation
Instructions.
[_]
Make
certain
a wall
receptacle
is awfilable
close
to the
hole
location
or make
arrangements
to install
a receptacle.
E_] Place the case in the wall
o )ening
and
I
secure with 12 1" long #10 wood screws,
NOTE:Drill pilot holes, if neeessary, for proper
installation. If the frame is oversized, use shims
to prevent case distortion.
Finish the Wall Opening
Caulk
all fimr sides on the outdoor
side of the case to prevent
moistm'e
from
getting
through
to the
interior
wall. Use of flashing
(drip
rail) will fla'ther
prevent
water from
dripping
inside
the wall and
down the outside
of the building.
, /
/
/
Lintel angle (if required),_ _ _
_
iiL
Caulking
_1
--
Trim molding (if desired)
OUTSIDE
Air louvers
(must project on
the outdoor side
of the wall)
aster line
• Tril _ m_
INSIDE
Bottom rail
Wood Filler and Caulking
(above and below the flashing)
Flashing (Drip rail)
t
4.5 cm (13/4") min.
15

Advertisement

Table of Contents
loading

This manual is also suitable for:

Asm08Asw08Ash10Asm10Asw10Ash12 ... Show all

Table of Contents