Operation - MULTIQUIP MAYCO LS600 Operation And Parts Manual

Mayco series concrete pump deutz bf4l914 diesel engine
Table of Contents

Advertisement

HOSE LUBRICATION
Before pumping, it is necessary to lubricate the hose.
This procedure prevents separation and blockages in the
hose. Inspect the lines at all times to prevent problems.
Before concrete is discharged into the hopper, it is sug-
gested that 3 to 4 gallons of water be sprayed into the
hopper, followed by approximately 5 gallons of a creamy
cement and water slurry (1/2 bag of cement to 5 gallons of
water).
Getting the concrete to flow through the hose
at the start of the pumping cycle can be one
of the most critical operations of the pour.
PRIMING THE PUMP WITH SLURRY MIXTURE
It is CRITICAL to the successful operation of a concrete
pump that the manifold and all delivery hoses, pipes and
elbows are coated with a film of lubrication BEFORE you
attempt to pump concrete.
Failure to properly prepare the pump and system will result
in a "dry pack" of concrete, blocking the shuttle valve tube
or delivery line.
1. Connect the entire delivery system to the pump. Pour
5 gallons of water and a bag of raw cement into the
hopper.
2. Place the Direction Control Switch to the REVERSE
position (Figure 25). This will mix the water and cement
into slurry.
FORWARD
Figure 25. Direction Control Switch (REVERSE)
3. Mix the slurry to the consistency of a smooth batter.
4. Position the first ready-mix truck at the hopper. Check
the concrete. DO NOT discharge concrete into hopper
at this time.
5. Place the Direction Control Switch in the FORWARD
position. This will start the flow of the slurry to the
hoses.
6. Keep the slurry flowing until most of it is pumped out.
However, make sure that some slurry is left on the
hopper when concrete is first discharged from the ready-
mix truck.
PAGE 28 — MAYCO LS600 PUMP — OPERATION AND PARTS MANUAL — REV. #4 (9/15/11)
PUMPING
1. Place the Pumping Control Switch to the LOCAL
Figure 26. Pumping Control Switch (LOCAL)
2. Slide the Volume Control Switch (Figure 27) to the
REVERSE
3. Scroll through the Digital Readout Screen with the
LS600 PUMP — OPERATION
WARNING - SAFETY GLASSES
Safety glasses MUST be worn at
all times when operating the pump.
Failure to follow safety guidelines
can result in serious injury.
A well-planned location of the pump and
routing of the hose before starting a pour
may save subsequent moves throughout
the job.
position (Figure 26) for normal pumping operation.
LOCAL
CENTER
OFF
right to increase the volume to approximately 10
strokes per minute. Sliding the volume control to the
left will decrease pump volume.
_
DECREASE
VOLUME
Figure 27. Volume Control
A thumping sound (cylinder stroke) should be heard.
The thumping sound represents the number of strokes
per minute (volume) of the pump.
scroll switch to go to Screen 7 (Figure 28). This screen
will show the volume in strokes per minute.
THROTTLE ON
STROKES: 100
STROKES/MIN 10.0
YDS/HR 0.0
Figure 28. Strokes Per Minute Display
REMOTE
+
INCREASE
VOLUME
7

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents