Mounting The Switch In A Standard 19" Rack; Power On (Ac Power); Power Failure (Ac Power) - D-Link xStack DGS-3120-48PC Hardware Installation Manual

Xstack dgs-3120 series layer2 managet stackable gigabit switch
Hide thumbs Also See for xStack DGS-3120-48PC:
Table of Contents

Advertisement

®
xStack
DGS-3120 Series Layer 2 Managed Stackable Gigabit Switch Hardware Installation Guide

Mounting the Switch in a Standard 19" Rack

Power On (AC Power)

1. Plug one end of the AC power cord into the power connector of the Switch and the other end into the local
power source outlet.
2. After powering on the Switch, the LED indicators will momentarily blink green. This blinking of the LED
indicators represents a reset of the system.

Power Failure (AC Power)

For AC power supply units, as a precaution, in the event of a power failure, unplug the Switch. When power has
resumed, plug the Switch back in.
CAUTION: Installing systems in a rack without the front and side stabilizers installed could cause the
rack to tip over, potentially resulting in bodily injury under certain circumstances. Therefore, always
install the stabilizers before installing components in the rack. After installing components in a rack, do
not pull more than one component out of the rack on its slide assemblies at one time. The weight of
more than one extended component could cause the rack to tip over and may result in injury.
Figure 2- 3. Installing the Switch in a rack
12

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents