Installing The Dell Readyrails System - Dell Force10 S4810P Manual

Installing the s4820t system
Hide thumbs Also See for Force10 S4810P:
Table of Contents

Advertisement

Installing the Dell ReadyRails System

The ReadyRails rack mounting system is provided to easily configure your rack for installation of your
S4820T switch. The ReadyRails system can be installed using the 1U tool-less method or one of three
possible 1U tooled methods (two-post flush mount, two-post center mount, or four-post threaded).
With the ReadyRails flange ears facing outward, place one rail between the left and right vertical
1
posts. Align and seat the rear flange rail pegs in the rear vertical post flange. In
its extractions show how the pegs appear in both the square and non-threaded round holes.
Figure 4-1. 1U Tool-less Configuration
Align and seat the front flange pegs in the holes on the front side of the vertical post. Refer to
2
Figure
4-1, step 2.
Repeat this procedure for the second rail.
3
To remove each rail, pull on the latch release button on each flange ear and unseat each rail. Refer to
4
Figure
4-1, step 3.
24
|
Installing the S4820T
Figure
4-1, step 1 and

Advertisement

Table of Contents
loading

This manual is also suitable for:

S4820tForce10 s4820t

Table of Contents