Installing The Dell Readyrails System - Dell Force10 S4820T System Getting Started Manual

Hide thumbs Also See for Force10 S4820T System:
Table of Contents

Advertisement

Installing the Dell ReadyRails System

The ReadyRails rack mounting system is provided to easily configure your
rack for installation of your switch. The ReadyRails system can be installed
using the 1U tool-less method or one of three possible 1U tooled methods
(two-post flush mount, two-post center mount, or four-post threaded).
1U Tool-less Configuration (Four-post Square Hole or Unthreaded Round
Hole):
1 With the ReadyRails flange ears facing outward, place one rail between the
left and right vertical posts. Align and seat the rear flange rail pegs in the
rear vertical post flange. In Figure 1-5, item 1 and its extractions show how
the pegs appear in both the square and unthreaded round holes.
Figure 1-5. 1U Tool-less Configuration
2 Align and seat the front flange pegs in the holes on the front side of the
vertical post. Refer to Figure 1-5, item 2.
3 Repeat this procedure for the second rail.
4 To remove each rail, pull on the latch release button on each flange ear and
unseat each rail. Refer to Figure 1-5, item 3.
15
Installation

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents