Preparation; Installing The Plasma Display Tv (Panel Unit) - Sharp PZ-43HV2E Operation Manual

Plasma display tv
Hide thumbs Also See for PZ-43HV2E:
Table of Contents

Advertisement

Preparation

Installing the Plasma Display TV (Panel Unit)

Over
10 cm
8
Over
50 cm
Locating
• Avoid direct sunlight and keep well ventilated.
• The length of the system cable used to connect the
Plasma Display TV (Panel Unit) and the AVC System
is about 3 m.
• This Plasma Display TV (Panel Unit) is heavy and
requires two or more persons to move it.
L
• Do not place anything on the AVC System. Otherwise, the
AVC System does not receive enough ventilation, and does
not operate properly.
A
• When installing, ensure that adequate ventilation space
is allowed at the top and rear of the product (as shown in
the diagram).
L
Operating Environment
Operating environment temperature and humidity: e0°C–
e40°C; less than 20–80%RH (cooling vents not blocked)
Avoid installing in the following locations:
• Under direct exposure to sunlight,
• Under strong artificial light,
• In high humidity,
• Poorly ventilated.

Advertisement

Table of Contents
loading

This manual is also suitable for:

Pz-50hv2ePz-50mr2ePz-43mr2e

Table of Contents