5.
No gas leakage?
In case of gas leakage, tighten parts of pipe connection. If leakage stops,
then proceed
step 6. If leak continues, remove the refrigerant used for the
leakage check and flare tubes again. Repeat vacuum and leak and if no
leakage, proceed to step 6.
6.
Detach the charge hose
from the service port, open 2-way valve and 3-way. Turn
the valve stem counterclockwise.
7 .
To prevent the gas leakage,
replace the service port and valve stem caps securely.
8.
After attaching each cap, check for gas leakage around the caps.
Step 1.
2-way valve Liquid Side
3-way valve Gas Side
Gaugemanifold(for R410A)
Anti countercurrent joint
Vacuum pump(for R410A)
Tube(for R410A)
Step 4.
2-way valve
3-way valve
O
Open 90
2-way valve 3-way valve
CAUTION
If the refrigerant of the air conditioner leaks, it is necessary to discharge all the
refrigerant. Vacuum first, then charge the liquid refrigerant into air conditioner
according to the amount marked on the name plate.
Please do not let other cooling medium, except specified one (R410A), or air
enter into the cooling circulation system. Otherwise, there will be abnormal
high pressure in the system casuing damage and possibly personal injuries.
1
Power Source Installation
The power source must be exclusively used for air
In the case of installing an air conditioner in a moist place,
rth leakage breaker (GFCI).
For installation in other places, use a circuit breaker as far
2
Cutting and Flaring Work of Piping
Pipe cutting is carried out with a pipe cutter and burs must
After inserting the flare nut, flaring work is carried out.
Flare tool for R410A
Clutch-type
clutch-type(Rigid-type) Wing-nut type (Imperial-type)
1.0~1.5mm
0~0.5mm
A
0~1/51 inch
3/76 ~1/17 inch
1.Cut pipe
Flare tooling die
3.Insert the flare nut
Correct
Lean
Damage of flare Crack
HSU09/12XCK-SM
Step 2.
Open
Step 3.
Close
Step 6.
2-way valve
3-way valve
2-way valve
Step 7.
3-way valve
Valve rod cap
Valve rod cap
Service port cap
conditioner. (Over I0A)
please install an ea-
as possible.
be removed.
Conventional flare tool
1.5~2.0mm
1/17 ~1/8 inch
2.Remove burs
4.Flare pipe
Incorrect
Partial
Too outside
3
On Drainage
Please install the drain hose so as to be downward slope without fail.
Please don't do the drainage as shown below.
It becomes
The end is imm-
high midway.
ersed in water.
Please pour water in the drain pan of the indoor unit, and
is carried out surely to outdoor.
In case that the attached drain hose is in a room, please
it without fail.
Refrigerant charge label
Contains fluorinated greenhouse gases
covered by the Kyoto Protocol
R410A
2
F
This product contains fluorinated greenhouse gases covered by
the Kyoto Protocol. Do not vent into the atmosphere.
Refrigerant type:R410A
GWP* value:1975
GWP=global warming potential
Please fill in with indelible ink,
• 1
the factory refrigerant charge of the product
• 2
the additional refrigerant amount charged in the field and
• 1+2 the total refrigerant charge
on the refrigerant charge label supplied with the product.
The filled out label must be adhered in the proximity of the product
charging port (e.g. onto the inside of the stop valve cover).
A contains fluorinated greenhouse gases covered by the Kyoto
Protocol
B factory refrigerant charge of the product: see unit name plate
C additional refrigerant amount charged in the field
D total refrigerant charge
E outdoor unit
F refrigerant cylinder and manifold for charging
Check for Installation and Test Run
Please kindly explain to our customers how to operate
through the instruction manual.
Check Items for Test Run
Put check mark
Gas leak from
connecting
Heat insulation of
connecting
Are the connecting wirings of indoor and outdoor firmly
inserted to the terminal block?
Is the connecting wiring of indoor and outdoor firmly fixed?
Is drainage securely carried out?
Is the ground wire securely connected?
Is the indoor unit securely fixed?
Is power source voltage abided by the code?
Is there any noise?
Is the lamp normally lighting?
Are cooling and heating (when in heat pump) performed normally?
Is the operation of room temperature regulator normal?
39
Less than
5cm
It waves.
The gap with the
There is the bad
ground is too small.
smell from a ditch
confirm that drainage
apply heat insulation to
A
1=
kg
B
2=
kg
C
1
1+2=
kg
D
E
in boxes
pipe
?
pipe
?
Domestic air conditioner

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Hsu09xck

Table of Contents