Installation - Baxi Neta-tec Combi GA Range Installation & Servicing Instructions Manual

Neta-tec combi ga range gas fired wall mounted condensing combination boiler
Table of Contents

Advertisement

Fig. 17
130mm
For Side Flue Exit
Fig. 18
3/4" BSP
Connections
Heating Flow
Fig. 20
© Baxi Heating UK Ltd 2007
175 mm
Minimum
Clearance
Vertical Flue
Centre Line
Boiler Mounting Bracket
Fixing Slots
Ø 8 mm
Profile of
Outercase
5 mm Minimum
Side Clearance
View from Underneath
Condensate
Pressure
Drain
Relief
Valve
(15mm)
25
40 mm
mm
65 mm
65 mm
162.5 mm
Heating
Hot Water
Gas
Inlet
Flow
Outlet
(22mm)
(22mm)
(15mm)
Combi Only
Not System
Part No. 720636502
Flushing Tube
Heating Return

9.0 Installation

9.1
IMPORTANT
RISK ASSESSMENT - Before commencing the installation
it is recommended that the 'Five Steps to Risk
Assessment' document published by the HSE is consulted,
and an assessment performed as described.
GAS SUPPLY - The gas supply, gas type and pressure
must be checked for suitability before connection (see
Section 7.4).
NOTE: a small amount of water may drain from the boiler
in the upright position. If pre-plumbing it will be necessary
to turn the carton over to access the wall plate first.
1. Remove staples, open flaps and remove the cardboard
sheet. Remove the polystyrene side pieces and literature. Two
people can then lift out the boiler (Fig. 17).
2. After considering the site requirements
(see Section 7.0) position the fixing template on the wall
ensuring it is level both horizontally and vertically.
3. Mark the position of the two most suitable fixing slots for
Part No. 720636502
116mm Dia Minimum
the wall plate and boiler lower fixing holes.
Aperture For Flue Tube
Side Flue
Centre Line
4. Mark the position of the centre of the flue hole (rear exit).
228 mm
For side flue exit, mark as shown (Fig. 18).
5. If required, mark the position of the gas and water pipes.
Remove the template.
6. Cut the hole for the flue (minimum diameter 116mm).
Ø 8 mm
7. Drill the wall as previously marked to accept the wall plugs
supplied. Secure the wall plate using the fixing screws.
8. Using a spirit level ensure that the plate is level before finally
tightening the screws.
5 mm Minimum
Side Clearance
9. Connect the gas and water pipes to the valves on the wall
plate using the copper tails supplied. Ensure that the sealing
washers are fitted between the connections.
10. Fit the filling loop as described in the instructions supplied
with it.
200 mm
Recommended
150 mm
Minimum
Clearance
65 mm
65 mm
65 mm
9.2
Heating
Cold Water
Return
Inlet
(22mm)
(15mm)
Combi Only
1. Connect a tube to the heating flow or return pipe (Fig. 20).
Not System
2. Make the flow and return connections to the isolation taps.
Fig. 19
Flush the system thoroughly to remove all impurities (see
System Details, Section 6.2).
Unpacking & Initial Preparation
Flushing
23

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents