Installer Guide; Handling And Unpacking; Nano - Baxi VALOR FIRES 845 Installer And Owner Manual

Dimension electric firefront for use with the baxi bermuda bbu15 he boiler
Table of Contents

Advertisement

1. HANDLING AND UNPACKING

Before continuing any further with the installation of this firefront please read the
following:
Important instructions.
A carry handle is fitted to the top of the firefront. We recommend that this is used
when moving the firefront.
The approximate lifting weights (kg) of the firefront parts are listed below:
Model
Lyrica

Nano

*See section 3.
One person should be sufficient to lift the firefront. If for any reason this weight is
considered too heavy then obtain assistance.
When lifting always keep your back straight. Bend your legs and not your back.
Avoid twisting at the waist. It is better to reposition your feet.
Avoid upper body / top heavy bending. Always bend from the knees rather than
the waist. Do not lean forward or sideways whilst handling the firefront.
Always grip with the palm of the hand. Do not use the tips of fingers for support.
Always keep the firefront as close to the body as possible. This will minimise the
cantilever action.
Use gloves to provide additional grip.
Always use assistance if required.
©
Baxi Heating U.K. Limited 2009.

INSTALLER GUIDE

Heat engine
8.0
8.0
Fascia
Firefront casting
1.5
2.68
Page 5
3.54
N/A
Spacer
1.0*
1.0*

Advertisement

Table of Contents
loading

Table of Contents