Installation sequence
Installing the boiler and making all connections
Removing the front panel and mounting the boiler
3.
2.
1.
2x
1. Release screws at the bottom of the
3. Hook the boiler into the wall
boiler; do not remove completely.
retainer.
2. Remove front panel.
8