2.3.1 Primary Input Power

The power strip is located at the interface panel iside the analyzer.
DANGER: POWER IS APPLIED TO THE INSTRUMENT'S CIR-
CUITRY AS LONG AS THE INSTRUMENT IS CON-
NECTED TO THE POWER SOURCE. THE STANDBY
FEATURE ON THE FRONT PANEL IS FOR SWITCH-
ING POWER ON OR OFF TO THE DISPLAYS AND
OUTPUTS ONLY.
The standard power supply requires a 110 VAC, 50-60 Hz power
source. 220 VAC, 50-60 Hz power-optional.

2.3.2 Fuse Installation

The fuse block, at the right of the power cord receptacle is 2A for
115VAC or 1A for 115VAC. Be sure to install the proper fuse as part of
installation.
2.3.3 Terminal Block Connections
Figure 2-2 shows the terminal block layout of the Equipment Interface
panel. The arrangement is shown as seen when the viewer faces the interface
panel from the front of the analyzer.