Installation Checklist - Teledyne 3300PB Operating Instructions Manual

Percent oxygen analyzer
Table of Contents

Advertisement

3 Installation
3.5

Installation Checklist

Before connecting the instrument to the power source and turning it on,
make sure you have:
Correctly installed the Sample and Exhaust gas lines
Opened the isolation valves
Checked for leaks
Set the sample pressure to 5–10 psig (34.5-68.9 Kpa), nominal
(for non-vacuum service units)
Set the flow
Once the above checks have been made, you can connect to the power
source. The instrument is now ready for operation.
3-8
Teledyne Analytical Instruments
Model 3300
PB

Advertisement

Table of Contents
loading

Table of Contents