Installing Electrode Holder And Work Clamp - Hobart Welding Products STICKMATE 205 AC Owner's Manual

Hide thumbs Also See for STICKMATE 205 AC:
Table of Contents

Advertisement

3-5. Installing Electrode Holder And Work Clamp

1
9
7
Tools Needed:
14 mm
3
2
4
6
PIECE
6 mm
Y Turn Off unit and disconnect
Removing Barrel From Elec-
trode Holder
1
2
3
4
Loosen set screw through access
hole and slide barrel away from
electrode holder.
5
Installing Electrode Cable and
Barrel onto Electrode Holder
5
6
Back out terminal screw from elec-
trode holder. Insert electrode cable
through barrel into end of electrode
holder and tighten terminal screw
securely.
Move barrel toward electrode hold-
er and tighten set screw to secure
barrel in place.
Installing Work Cable onto Work
Clamp
7
8
9
Route work cable through work
clamp as shown and install onto
mounting bolt using supplied hard-
ware.
8
input power before installing
electrode holder or work
clamp.
Electrode Holder
Barrel
Access Hole
Set Screw
Electrode Cable From Unit
(Has Bare Conductors on
End)
Terminal Screw
Work Clamp
Work Cable From Unit (Has
Ring Terminal on End)
Mounting Bolt
Ref. 802 251-A / 803 583-B
OM-949 Page 11

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents