Download Print this page

GReddy Supercharger Kit Installation Manual page 11

2000-2002 toyota celica gt-s (zzt231) mp62 supercharger kit

Advertisement

3-11 Kit Intake Tube Installation
(1) Remove the studs on the OE intake air surge tank
and screw them into the Kit intake tube.
(2) Attach the Kit intake tube to the supercharger inlet.
At the same time, place the spacer between the Kit
intake tube bracket and "Thread A" on the picture
and use the M8 x 50mm bolt to secure the bracket.
Secure the other end of the bracket to the engine
block.
Use silicone sealant between the supercharger inlet
and intake tube flange. Prevent sealant from
protruding to the inside of the flange.
Torque bracket bolts starting from the engine.
3-12 OE Throttle Body Installation
(1) Place the OE gasket on the intake tube and install
the throttle body, water bypass hose, and electrical
connectors.
Re-use OE bolts and nuts. Please confirm that the
throttle body gasket is place properly also.
(2) Install the accelerator control cable.
For vehicles without Auto Cruise Control
Install the accelerator control cable bracket to the
intake tube using the OE bolts and install the
throttle cable to the throttle lever.
〈Part №3〉
〈Parts №12,14,26,29,31〉
―11―
Thread A
Bracket spot
Spacer
on engine

Advertisement

loading