General
Operating
Instructions:
•
Let the unit
rest,
UNPLUGGED
for 4 hours
once you have it placed
in
your
home.
•
Units must
have a minimum
of a 2 inch clearance
all around
to allow for
maximum
airflow
and function.
Building
in these
units
is not possible.
You may have a recessed
application
if there
is at least a 2 inch clearance
on all sides for proper
air flow and ventilation.
•
Units include
a drip pan for condensation
and must be periodically
emptied.
•
Do not install
in a garage
or basement.
Please
read
and follow
all safety
rules
and
operating
instructions
before
using.