Yard Machines 500 Series Operator's Manual page 11

Two-stage snow thrower
Hide thumbs Also See for 500 Series:
Table of Contents

Advertisement

AugerControlTest
WARNING
: Prior to operating your snow thrower,
carefully read and follow all instructions below.
Perform all adjustments to verify your unit is
operating safely and properly.
Perform the following
test before operating
your snow thrower
for the first time a nd at the start of each winter.
Check the adjustment
of the auger control as follows:
1.
When the auger control
is released and in the disengaged
"up" position,
the cable should
have very little slack. It
should
NOT be tight.
2.
In a well-ventilated
area, start the snow thrower
engine as
instructed
in the separate engine
manual.
3.
While standing
in the operator's
position
(behind
the snow
thrower),
engage the auger.
4.
Allow the auger to remain engaged
for approximately
ten
(10) seconds
before releasing
the auger control.
Repeat this
several times.
5.
With the auger control
in the disengaged
"up" position,
walk to the front of the machine.
6.
Confirm
that the auger has completely
stopped
rotating
and shows NO signs of motion.
If the auger shows ANY
signs of rotating,
immediately
return to the operator's
position
and shut off the engine.
Wait for ALL moving
parts
to stop before re-adjusting
the auger control.
7.
To readjust the control
cable, loosen the upper hex screw
on the auger cable bracket.
8.
Position the bracket upward
to provide
more slack (or
downward
to increase
cable tension).See
Fig. 3-15.
9.
Retighten
the upper hex screw.
10.
Repeat Auger Control
Test to verify proper adjustment
has
been achieved.
Fig. 3-15
\
\
\,
\
\
J
SECTION 3 -- ASSEMBLY & SET-UP
11

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

600 series

Table of Contents