Assembly And Setup; Contents Of Carton - MTD 550 Series Operator's Manual

Hide thumbs Also See for 550 Series:
Table of Contents

Advertisement

Available languages

Available languages

Assembly & Set-Up
3
Contents of Carton
One Log Splitter
One Tongue Assembly
One Operator's
Manual
One Engine Operator's
Manual
l_ll
WARNING!
Use extreme
caution
when unpacking
this machine.
Some components
are very heavy and
will require additional
people
or mechanical
handling
equipment.
NOTE:All
references
in this manual to the left or right side of the
log splitter
are from the operating
position
only. Exceptions,
if
any, will be specified.
Assembly
Attaching the JackStand
The jack stand is shipped
in the transport
position.
1.
Remove the spring clip and clevis pin and then pivot the
jack stand towards
the ground
into the operating
position.
2.
Secure the jack stand in position
with the clevis pin and
spring clip. See Fig. 3-1.
!
Clevis Pin
Attachingthe Tongue
1.
With the log splitter
still standing
upright,
remove the two
hex bolts and hex nuts from the tank bracket. See Fig. 3-2.
(_
Tongue
He× Nuts
"_
Tank Bracket
.......
J
2.
Figure 3-2
Align the holes in the tongue
with the holes in the tank
bracket and secure with the hardware just removed.
See
Fig. 3-2.
NOTE:The
high pressure hose, which runs from the gear
pump
the bottom
of the control
valve, must be above the
tongue
assembly.
See Section 9 (Illustrated
Parts List) if you
are unsure of which hose is the high pressure hose.
Figure 3-1

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents