GE GTH18KBXBRCC Owner's Manual And Installation Instructions page 14

Top-freezer
Table of Contents

Advertisement

Available languages

Available languages

Installation
Instructions
B
INSTALLING THE WATER LINE
(CONT.)
[] FASTEN THE SHUTOFF
VALVE
Fasten
the shutotI
xalxe to the cold water
pipe with
the pipe clamp.
Pipe Clamg
Saddle-Type --5#
Shutoff Valve
,)
--
VerticalCold
Water Pipe
NOTE:
C(mmmnwealth
of Massachusetts
Plumbing
Codes
248CMR
shall be adhered
to. Saddle
wdves
are illegal
and use is not permitted
in Massachusetts.
Consult
with wmr licensed
plumber.
[] TIGHTEN
THE PIPE CLAMP
Tighten
tile clamp
screws
tmtil tile sealing
washer
begins
to swell.
NOTE:
Do not overtighten
or vou mav crash
tile
tubing.
Washer
Pi
End
Clam_
[] ROUTE THE TUBING
Route
tile tubing
between
tile cold water line and
tile refrigerator.
Route
tile tubing
through
a hole drilled
in tile wall
or floor
(behind
tile refl'igerator
or a(!ja(-ent
base
cabinet)
as close to the wall as possible.
NOTE:
Be sure
there
is sufficient
extra
tubing
(about
8 feet
[244 cm]
coiled
into
3 tm'ns of about
10" [25 cm]
diameter)
to allow the refrigerator
to
move out fl'om
the wall after installation.
[]
CONNECT
THE TUBING
TO THE VALVE
Place
tile compression
nut and ferrule
(sleexe)
for coI)per
tubing
onto
the end
of tile tubing
and
connect
it to tile shutott
xalxe.
Make
sm'e tile tubing
is flfllv inserted
into
tile
wove. Tighten
the compression
nut seem'ely.
For plastic
tubing
fl'om
a GE Smart(:onnect"
Refl'igerator
Tubing
kit, insert
the molded
end
of the tubing
into
the shutott
wdve and
tighten
compression
nut tmtil it is hand
tight,
then
tighten
one additional
turn with a wrench.
Overtightening
IIl_lV
Catlse
leaks.
Saddle-Type
ShutoffValve
?ression
Nut
SmartConnect _
Tubing
Packing Nut.
Outlet Valve--
--Ferrule
(sleeve)
NOTE:
Commonwealth
of Massachusetts
Plumbing
Codes
248CMR
shall be adhered
to. Saddle
wflves
are illegal
and use is not permitted
in Massachusetts.
Consult
with vom" licensed
plmnber.
[] FLUSH OUT THE TUBING
Turn
tile main
water supply
on and flush
out tile
robing
until the water
is clear,
Shut the water
off at tile water valve after about
one
quart
(l liter)
of water
has been
flushed
through
tile tubing.
14

Hide quick links:

Advertisement

Chapters

Table of Contents
loading

Table of Contents