Instagation Instructions Through-The-Wall Installation-Optional - GE ASH08 Owner's Manual And Installation Instructions

Table of Contents

Advertisement

Through-the-WallInstallation Instructions-OptionaL
The case may be installed throughthe wall in beth existing and new construction.
Read completely, then follow step-by-step.
IMPORTANT
Through-the-wallinstallationis not appropriate
if any of theside louvers in the case will be
obstructedby the wall.
All side louvers in the case mustproject on the
outdoorside of the wall.
The roomside of the case mustproject into the
roomat least 13/g" from the finished wall.
The case mustbe installed level from side-to-side
and with a slight tilt fromfront to rear. Usea level;
abouta 1/2bubblewill be thecorrectcaseslant to
theoutside.
[]Remove
the air conditioner
fl'om
the case.
For specific
instruction,
refer
to the
Window
Installation
Instructions.
[]Make
certain
a wall receptacle
is available
close to the hole location
or make
arrangements
to install
a receptacle.
[]Place
the case in the wall opening
and
secure with 12 1" long #10 wood screws.
NOTE:Drill pilot holes, if necessary, for proper
installation. If the frame is oversized, use shims
to prevent case distortion.
Finish the Wall Opening
Caulk all four sides on the outdoor
side of the case to prevent moisture
from getting through
to the
interior
wall. Use of flashing (drip rail) will further
prevent water fl'om dripping
inside the wall and
down the outside of the building.
x
ill]- P ,aster,ine
Lintel angle (if required)_{
l/
Tnmmoldln
ffd
ir
Cau,k °g
- 111
--
"
"g
(" as" ed)
OUTSIDE
Air louvers
(must project on
the outdoor side
of the wall)
Wood Filler and Caulkir
(above and below the flashing)
Flashing (Drip rail)
INSIDE
--I Bottom rail
4,5 cm (13/4") min.
15

Advertisement

Table of Contents
loading

This manual is also suitable for:

Ash10AswioAsh12Asw12Asw08Asw10

Table of Contents