GE ASH08 Owner's Manual And Installation Instructions page 9

Table of Contents

Advertisement

Preparing to install the air conditioner.
Read these instructions completely and carefully.
Before You
NOTE TOINSTALLER:Leave these instructions with
the air conditioner after installation is completed.
NOTE TO CONSUMER:Keep this Owner's Manual
and Installation Instructions for future use.
IMPORTANT NOTES:
For personal safety, this air conditioner must be
properly grounded.
It is important to have the wall outlet and circuit
checked by a qualified electrician if there is any
doubt as to whether a proper ground exists.
Follow National Electric Codes (NEC) and/or local
codes and ordinances.
_
CAUTION:
_
DOnot, under any circumstances, cut or
i_
remove the third (ground) prong from the
power cord.
Do not change the plug on the power cord
of this air conditioner.
Aluminum house wiring may present
special problems--consult
a qualified
electrician.
Electrical Requirements
Some models
require
llS/120-volt
ac,
60-Hz grounded
outlet
protected
with
a 15-amp time delay" filse or circuit
breakel:
_i11e 3-prong
grounding
plug minimizes
the
possibility
of electric
shock hazard.
If the ,a_ll oudet
you plan m use is only" a 2-prong
outlet,
it is your
responsibility
to have it replaced
with a prowrly
grounded
3-prong
u_ll outlet.
©
Some models
require
230/208-volt
ac,
protected
with a time delay filse or circuit
breakeE
These
models
should
be installed
on their own single branch
circuit for best
performance
and to prevent
overloading
hou_
or apartment
wiring circuits,
which
could cm_se a possible
fire hazard
from
overheating
wires.
Tools YouWillNeed
_))); Phillips-head
screwdriver
N Adjustable
wrench
/_5Ruler or tape measure
U_Scissors or knife
_ Pencil
_ Level
9

Advertisement

Table of Contents
loading

This manual is also suitable for:

Ash10AswioAsh12Asw12Asw08Asw10

Table of Contents