Download Print this page

Tools Required - Craftsman 536.882091 Operating Instructions Manual

120 v.a.c. 12 amp. 60 hz. double insulated 20" clearing width electric snow thrower

Advertisement

• Never attempt to make any adjustments while
the engine (motor) is running (except when
specifically recommended by the manufac-
turer).
• Maintain or replace safety and instruction
labels, as necessary.
• When
servicing use only identical replace-
ment parts. Replace or repair damaged cords.
• Maintain snow throwers with care.
Follow
instructions and changing accessories.
• Run the snow thrower a few minutas after
throwing
snow to prevent freeze-up
of the
auger/impeller.
/_
WARNING:
Look for this symbod to point
out important safety precautions. It means---At-
tention!!! Become alerti!! Your safety is involved.
Contents
of Parts Bag
n
(not shown
actual
size)
q!
1 - Owner's Manual
1 - Parts Bag
1 - Warranty Card
1 - Key
ODDDODODDODDOOOOD
I -Plastic Tie
Z_
CAUTION:
Always wear safety
glasses or eye shields while assembling
snow thrower,
TOOLS REQUIRED
FOR ASSEMBLY
1-Knife to cut carton
1 - Pliers
The figure below shows the snow thrower
completely assembled.
References to the right or left hand side
of the snow thrower are from the viewpoint
of the operator's position behind the unit.
Control
ControlSwitch Lever
Switch
Upper Handle
Chute
Deflector Tee
Switch
Cord
Tie
TO REMOVE
SNOW
THROWER
FROM
CARTON
• Remove the inserts positioned around the
unit and the packing material.
4
• Cut down all four corners of the carton
and lay the panels flat.
• Pull snow thrower out of the carton.
TO ASSEMBLE
THE HANDLE
• Remove wrap on upper handle and along
the side of both handles and on the
chute control rod. Discard wrap.
• Loosen the tee knobs on each side of the
upper handle (see left hand figure on this
page).
NOTE; Make sure the control switch
cord and pigtail are not caught between
upper end lower handle.
• Raise the upper handle to the operating
position. Hold upper handle apart to
prevent scratching lower handle.
• Tighten the tee knobs. Make sure pigtail
is free from the control switch cord.
• Secure control switch cord to handle
using plastic tie found in plastic bag.
Thread the pointed end of the tie through
the square end. Pull tie tightly around the
cable and handle, after seeudng clip
excess from tie.
TO ASSEMBLE
THE CHUTE
CONTROL
ROD
• Cut tie holding chute control rod to
bracket.
• Remove plastic bag from chute control
rod.
• Remove white cap, washer and cotter pin
from crank.

Advertisement

loading