3. Attach the UPS to a power source.
4. Connect the components to the Power Distribution Unit (PDU):
5. Quorum server
6. NAS servers
HP StorageWorks NAS 8000 Dedicated Storage High Availability, Solution Integration Manual (SIM)
— Select Actions > Edit UPS Properties.
— Input the correct information in the Edit UPS Properties dialog box, then click OK.
A separate UPS should be used with each NAS server.
Symmetra RM UPS:
— If the planned power load is less than or equal to 5 kVA, plug the line into an
appropriate outlet.
— If the planned power load is greater than 5 kVA, a qualified electrician must hard-wire
the input power.
Symmetra UPS:
— Regardless of the power load, a qualified electrician must hard-wire the input power.
a. Connect the power cables of the components in each rack to the PDU strip on the rack
as shown in the diagrams in
on page 9.
b. Plug the PDU into the Power Distribution Panel (PDP) on the UPS.
c. Power up the components one at a time, in the following sequence, to minimize
current inrush:
— UPS systems
— Tape library
— FC switches
— disk enclosures
— Storage arrays
Caution:
Do not boot the NAS servers until the storage array has finished powering up. As
the array is powering up, amber and green lights will turn on and blink. When only green
lights remain on, it is safe to boot the NAS servers.
Solution Integration and Product Configuration Overview
Installation Guide
49