Assembly - Craftsman 917.292350 Owner's Manual

5.0 hp 24 inch tine width front tine tiller
Table of Contents

Advertisement

....
• :
.........
,,,,=== = ......
.,,
.
ASSEMBLY
Your new tiller has been assembled at the factory with exception of those parts left unassembled for shipping purposes,, To
ensure safe and proper operation of your tiller all parts and hardware you assemble must be tightened securely° Use the
correct tools as necessary to insure proper tightness,
TOOLS REQUIRED
FOR ASSEMBLY
A socket wrench set wilt make assembly easier° Standard
wrench sizes are listed.
(1) Utility knife
(1) Screwdriver
(1) Pair of pliers
(2) 1/2" wrenches
OPERATOR'S
POSITION
(See Fig. 1)
When right or left hand is mentioned in this manual, it
means when you are in the operating position (standing
behind tiller handles)_
FRONT
LEFT
IGHT
OPERATOR'S
POSITION
FIG. 1
CONTENTS
OF HARDWARE
PACK
(1) Manual
(2) Cardage Bolts 5116-18 UNC x 2_3/8 Gr. 5
(1) Plastic Cable Clip
1,1 t
i, J J
i J _,JJ, itui
0
(2) Flange Locknuts 5/16-18 UNC
(2) Hex Bolts 5/16-18 x 1-1/4
©
(2) Hex Nuts 5/I6-t8
(2) Lock Washers 5/16
6

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents