Download Print this page

Installation - Carrier 38EYG Installation And Start-Up Instructions Manual

12 seer split-system heat pump with puron refrigerant

Advertisement

NOTE: Avoid contact between tubing and structure
--OUTDOOR
WALL_
INDOOR WAL_
_"CAULK--_
_
F
LIQUID TUBE
_/_
VAPOR TUBE
t.--INSULATION
--J
THROUGH THE WALL
HANGER STRAP--
k
(AROUND VAPOR
_
--
TUBE_,
h
.,_--JOIST
i]
_
INSULATION
#VAPOR
TUBE
f
r' MIN. - ---I
I_
L LIQUID
TUBE
SUSPENSION
A94028
Fig. 2--Connecting
Tubing
Installation
INSTALLATION
IMPORTANT:
Specifications
for
this
unit
in residential
new
construction
market
require
using
the outdoor
unit,
indoor
unit,
refrigerant
robing
sets, metering
device,
and filter
&ier listed
in
presale
literature.
There
can be no deviation.
Consult
the Appli-
cation Guideline
and Service
Manual
for Residential
Split-System
Air
Conditioners
and Heat Pumps
using
Puron:R; Refrigerant
to
obtain
required
unit changes
for specific
applications
and for R-22
retrofit.
Step
1--Check
Equipment
and Job Site
UNPACK
UNIT
Move
to final location.
Remove
carton
taking
care not to damage
unit.
INSPECT
EQUIPMENT
File claim
with shipping
company
prior to installation
if shipment
is damaged
or incomplete.
Locate
unit rating
plate
on unit corner
panel.
It contains
information
needed
to properly
install
unit.
Check rating
plate
to be sure unit matches
job specifications.
Step 2--Install
On a Solid,
Level
Mounting
Pad
If"conditions
05"local codes require
the unit be attached
to pad, tie
down
bolts
should
be
used
and
fastened
through
knockouts
provided
in unit base pan. Refer to unit mounting
patteru
in Fig. 3
to determine
base pan size and knockout
hole location.
On rooftop
applications,
mount
on level platform
or frame.
Place
unit above a load-bearing
wall and isolate unit and tubing
set fi'om
structure.
Arrange
supporting
members
to adequately
support
unit
and minimize
transmission
of vibration
to building.
Consult
local
codes goveruing
rooftop
applications.
I
1
C
1
I
B
I
3/8"D
(953)
TIEDOWN
KNOCKOUTS
(2) PLACES
.I
A94199
DIMENSIONS (IN.)
UNIT
SIZE
018, 024, 030
038-080
MINIMUM
MOUNTING
PAD
DIMENSIONS
22-1/2 X 22-1t2
30 X 30
TIEDOWN
KNOCKOUT
LOCATIONS
A
B
C
3-11/16
18-1/8
14-3/8
6-1/2
23-1/2
20
Fig. 3--Mounting
Unit to Pad
F.,I[_
Do not allow POE lubricant
to come into contact
with roofing
materiah
POE
may
deteriorate
certain
types
of synthetic
roofing.
Roof mounted
units
exposed
to winds
above
5 mph may require
wind
baffles.
Consult
the
Application
Guideline
and
Service
Manual
for Residential
Split-System
Air Conditioners
and Heat
Pumps
using
Puron'K
Refrigerant
for wind baffle
construction.
NOTE:
Unit
must
be level
to within
± 2 ° (± 3/8 in.ift)
per
compressor
manufacturer
specifications.
Step
a--Clearance
Requirements
When
installing,
allow
sufficient
space
for
airflow
clearance,
wiring,
refrigerant
piping,
and service.
Allow
30-in.
clearance
to
smwice end of unit and 48 in. above unit. For proper
airflow,
a 6-in.
clearance
on 1 side of unit and 12 in. on all remaining
sides must
be
maintained.
Maintain
a distance
of 24 in. between
units.
Position
so water,
snow,
or ice l'rom roof or eaves
cannot
fall
directly
on unit.
On
rooftop
applications,
locate
unit
at least
6 in.
above
roof
surface.
Step
4--Operating
Ambient
The mininmm
outdoor
operating
ambient
in cooling
mode without
additional
accessories
is 55°F,
and the maximum
outdoor
operat-
ing ambient
in cooling
mode
is 125°F.
The maxinmm
outdoor
operating
ambient
in heating
mode
is 66°F.

Advertisement

loading