Adjusting The Rear Rack Posts (Optional) - Dell PowerEdge PDU Managed LED Installation Manual

Document
Hide thumbs Also See for PowerEdge PDU Managed LED:
Table of Contents

Advertisement

Available languages
  • EN

Available languages

  • ENGLISH, page 1

Adjusting the Rear Rack Posts (Optional)

NOTE:
Do not move the front rack posts located on the rack enclosure.
The position of the rack posts can be adjusted to accommodate systems
of various depths.
1 Open the rack doors.
2 To remove the air channel from the rack, remove the two screws from the
front flange (one per side) and two screws from the back of the rack using a
#2 Phillips cross-tip screwdriver. See Figure 19.
3 Push the air channel forward or remove it from the rack enclosure to access
the bottom screws for the rack post. See Figure 19.
Figure 19. Removing the Air Channel
3
1
back screws (2)
3
front screws (2)
34
Installation Guide
2
2
air channel
1

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents