Assembly Procedures - Robin America RGV7500 Service Manual

Table of Contents

Advertisement

10-3 ASSEMBLY PROCEDURES
10-3-1 ENGINE
and
FRAME
(1) Attach the mount rubbers to the frame. Insert
the setting tongue of mount rubber into the hole
.on the frame and tighten the nut from the bot-
tom of the frame.
M8
flange nut
. .
. 4
pcs.
11.8
-
13.7
N-m
120
-
140
kg-cm
8.7
-
10.8 ft-lb
FRAME UPPER
-
Fig.
10-22
NOTE
:
The mount rubbers are selected to reduce vibration most effectively by model. Be sure to use
correct mount rubber for your generator. Although mount rubbers have the same appearance
their characteristics are different.
(2) Install the engine into the frame from the
side
of
it.
Tighten the nuts over the mount rubber bolts
to fix.
M8
nuts
. .
.2 pcs.
120
-
140
kg-crn
8.7
-
10.8 ft-lb
NOTE : Remove the air cleaner cover for easier installation.
NOTE : When tightening the nuts, slightly lift the engine so that the weight is not applied to the mount
rubbers.
10-3-2 FRONT COVER
Attach the front cover to the engine main bearing
cover. Match the faucet joint and tighten the bolts.
M8 x
20
mm bolt.
.
- 4
pcs.
M8 spring washer.
.
. 4
pcs.
11.8
-
13.7
N-m
120
-
140 kg-cm
8.7
-
10.1 ft-lb
Fig.
10-23
-
45-

Advertisement

Table of Contents
loading

Table of Contents