Powering On The Server; Section 3.5, "Powering On The Server - Fujitsu SPARC Enterprise M3000 Installation Manual

Hide thumbs Also See for SPARC Enterprise M3000:
Table of Contents

Advertisement

Note – Rephrase as to apply the settings. The XSCF unit must be reset with the
applynetwork and rebootxscf commands.
2. Log in to the XSCF Shell with the user account and password that were set in
Step 1.
For details on how to log in to a user account, refer to the SPARC Enterprise
M3000/M4000/M5000/M8000/M9000 Servers XSCF User's Guide.
3.5

Powering On the Server

This section explains how to power on the server for the first time.
1. Set the key on the operator panel to the Service position.
2. From the XSCF Shell, type:
XSCF> console -d 0
Connect to DomainID 0?[y|n] :y
3. Confirm that the XSCF STANDBY LED (green) on the operator panel is lit.
4. Press the Power button on the operator panel to power on the server.
The server starts and begins a self-diagnosis.
Watch the administration console for error messages during this boot process.
For details on troubleshooting during installation, refer to
5. Confirm that the POWER LED (green) on the operator panel is lit.
6. Confirm that "ok" is displayed on the domain console.
7. Check the LED for each component.
For the description of LEDs for each component and its function, refer to the
SPARC Enterprise M3000 Server Service Manual.
8. Press the Enter key, and then press the "#" and "." (period) keys.
This key combination switches you from the domain console to the XSCF console.
9. From the XSCF Shell, execute the fmdump command or showlogs command,
and confirm that no errors are found.
For details, refer to
Section B.3.2, "Using the showlogs Command" on page
3-10
SPARC Enterprise M3000 Server Installation Guide • January 2009
Section B.3.4, "Using the fmdump Command" on page B-9
Appendix
B.
and
B-7.

Advertisement

Table of Contents
loading

Table of Contents