Installation Overview

This chapter describes the steps required in the processes from installing the server
to checking hardware operation.
For details, refer to the section indicated by double quotation marks (").
Installation Workflow
FIGURE 1-1
Installation Stage
Preliminary checks
Installation and
connection of this
server
Setting confirmation
and power-on
Workflow Task
Before installing the server, check the environmental requirements, power facility, and
installation location.
Section 2.2, "Before Installing the Server" on page 2-2
Prepare the items required for installing the server.
Section 2.3, "Requirements for Server Installation" on page 2-8
Check the components and accessories items.
Section 3.1, "Checking Components" on page 3-1
Refer to the relevant equipment rack document to install the server in the rack.
Connect the input power cable, UPS cable, and administration console cable.
Section 3.3, "Connecting Cables" on page 3-2
Log in to the XSCF shell, check the host public key of the XSCF, register a user
account, set the time, and make other advanced settings.
Section 3.4, "Setting and Checking the Required Information for the Server" on
page 3-6
1-1

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the SPARC Enterprise M3000 and is the answer not in the manual?

Table of Contents