Installation - White Mountain Hearth DVP42FP Installation Instructions And Owner's Manual

The tahoe direct vent zero clearance gas fireplace heater
Table of Contents

Advertisement

Framing and Finishing
1. Choose unit location.
2. Frame in fireplace with a header across the top. It is important to
allow for finished face when setting the depth of the frame.
3. Attach fireplace to frame using adjustable frame. Preset
depth to suit facing material (adjustable to 1/2", 5/8" or 3/4"
depths).
4. Use (8) 1/2" hex-head screws supplied in hardware package,
to screw through slotted holes in drywall strip and then screw
into pre-drilled holes on fireplace side. Measure from face of
fireplace to face of drywall strip to determine final depth.
Vent Pipe Clearance
Note: Maintain one inch (1") of clearance around vertical vent
pipe. See Figure 9A. For horizontal vent, maintain a minimum
1" clearance to the bottom and sides of the vent, and 3" clearance
to combustibles above the vent pipe. See Figure 9B
Top of Vent
(76 mm)
3"
(25 mm)
1"
21759-6-0608

INSTALLATION

Combustibles NOT
allowed in shaded
area
Figure 9B
5" Diameter flue
8" Diameter
intake vent
1"
(25 mm)
Figure 8
VENT PIPE
1" MINIMUM CLEARANCE AROUND VENT PIPE
Figure 9A
Page 11

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents