Desa CB36N Installation And Owner's Operation Manual page 11

Vented gas fireplace 4" b-vent decorative gas fireplaces
Table of Contents

Advertisement

CHECKING FOR PROPER VENTING
After completing and checking electrical,
gas and vent connections, follow lighting
instructions.and.allow.main.burner.to.run.for.
approximately. 5. minutes.. Hold. a. match. or.
butane lighter flame, near opening between
glass and fireplace face and play it along
entire.length.of.opening.(Smoke.may.also.be.
used). Proper venting will tend to draw flame
or smoke into appliance. Improper venting,
escaping or spillage of burned gas, is indi-
cated when match flickers or goes out (see
Figure.1)..Smoke.will.also.tend.to.disperse.
away.from.appliance.
If appliance is not venting properly, shut it off
and notify your installer or a qualified service
agency.to.inspect.venting.system.
Figure 12 - Checking for Spillage
ELECTRICAL SUPPLY CONNECTION
CAUTION: Disconnect the
electrical power to the supply
circuit before attempting to con-
nect or service this appliance.
A prewired junction box receptacle with strain
relief. is. provided. on. right. side. of. cabinet. for.
hard wiring unit to a 15 Amp, 120 VAC, 60 Hz
grounded.branch.circuit..If.installation.demands.
electrical supply be connected from the left, the
entire.receptacle.box.can.be.relocated.to.the.
left.side.by.following.these.instructions:
117437-01D
VENTING INSTALLATION
Continued
www.desatech.com
Note: If you do not need to relocate the junc-
tion box, to connect the electric supply follow
steps 8 through 11 only:
1.. Remove. . screws. and. outer. cover. with.
strain.relief.bushing.on.right.side.of.cabi-
net.(see.Figure.13).
2. Remove inner retaining screw on junction
box.mounting.tab.
3. Slide junction box up until screw mounting
tab.is.lined.up.to.notch.in.outer.cabinet.
4. Swing junction box out and slip retaining
flange out through slot in outer cabinet.
5.. Remove..screws.and.outer.cover.on.left.
side.of.outer.cabinet.
6. Reinsert junction box retaining flange
through.slot.now.on.left.side.and.swing.
screw.mounting.tab.back.through.notch.
as.before.
7. Slide junction box down till mounting tab
holes.line.up.and.replace.inner.retaining.
screw.
8. With junction box cover removed, pull
end.of.3-wire.Romex.supply.line.through.
universal. strain. relief. bushing. on. cover..
(see.Figure.13).
9.. Strip.back.outer.Romex.to.about.4".and.
connect black, white and green wires ac-
cordingly.using.3.wire.nut.connectors.
10. Tuck tailing wires into junction box and
replace junction box cover using 2 remain-
ing.screws.
11. Tighten adjustment on universal strain
bushing.to.secure.Romex.sheathing.and.
complete.supply.connection.
J-Box.
Cover.
with.Strain.
Relilef
Romex.
Cable
Figure 13 - Relocating Junction Box Recep-
tacle and Electrical Supply Connection
J-Box.
Cover
J-Box.Cover.
with.Strain.
Relief
J-Box.with.
Receptacle
Screw/Tab.
Retainer
11

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Cb36pCb36neCb36peVcb36neVcb36pe

Table of Contents