Page 1
IS-CTS3_FLNG Lighting Systems NOTE: FIXTURES WERE DESIGNED TO BE INSTALLED PRIOR TO CEILING. We reserve the right to change details of design, materials and finish.
IS-CTS3_FLNG Lighting Systems Step 1. Individual Installation Figure 1 Hang Fixture from Struc- ture Above. Make Sure Fixture is Leveled Length- wise and Widthwise. Figure 2 Figure 3 Provide Power to Fixture Install Diffuser Provide Through Access Plate and with Fixture. Lens or Test.
IS-CTS3_FLNG Lighting Systems Step 2. Row Installation End or Telescopic Access Plate Individual 1 or More Joiners Spline Aligner Starter Figure 4 Spline Aligner We reserve the right to change details of design, materials and finish.
Need help?
Do you have a question about the CTS3_FLNG and is the answer not in the manual?
Questions and answers