Operation; Mim-G01; Mim-A01 - Mitsubishi Electric MIM-A01 Instruction Manual

Mim series industrial modems
Table of Contents

Advertisement

MIM-G01

5

Operation

If you have followed the steps in the chapters 3 and 4, your modem is ready for operation.
5.1
MIM-G01
The MIM-G01 presents two LEDs, which indicate the devices current operating mode. After the
power supply has been switched on, a self test will be executed. The end of this test is indicated
by a acoustic signal (short beep). After the test, the device tries to make a connection to the GSM
network. The green LED will flash slowly when the log in was successful..
5.2

MIM-A01

The MIM-A01 presents five LEDs, which indicate the devices current operating mode. After the
power supply has been switched on, a self test will be executed. The end of this test is indicated
by a acoustic signal (short beep).
Fig. 5-1:
Power
(yellow)
Tab. 5-1:
5 - 1
Mail in
Mail in
Service
Service
DC 10...30V
DC 10...30V
-
-
+
+
Power
LEDs on MIM-A01
Mail in
Line
(red)
(green)
LEDs during the self-test
SUPER MODEM
SUPER MODEM
56k
56k
Mail out Modem Mode
Mail out Modem Mode
Service
Service
Mail in
Mail in
DC 10...30V
DC 10...30V
-
-
+
+
Power
Line
Line
COM1 (RS232)
COM1 (RS232)
Mail out Modem Mode
Mail out Modem Mode
Line
Line
Mail out
Modem Mode
(yellow)
(red)
Flashes
Operation
COM1 (RS232)
COM1 (RS232)
Starting self test
Testing LEDs
Testing memory
Modem is fully operational
Duration: approx.
MITSUBISHI ELECTRIC
12 sec

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Mim-g01

Table of Contents