Set Thermostat Heat Anticipator - Bryant 355MAV Installation, Start-Up, And Operating Instructions Manual

Series f deluxe 4-way multipoise variable-capacity direct-vent condensing gas furnace installation, start-up, and operating instructions
Table of Contents

Advertisement

Furnace Input Rate
at Sea Level
100,000
ALTITUDE
(FT)
0–2000
2001–3000
3001–4000
4001–5000
5001–6000
6001–7000
7001–8000
8001–9000
9001–10,000
* Derate multiplier factor is based on midpoint altitude for altitude range.
Furnace must operate within the temperature rise ranges specified on the furnace rating plate. Determine the air temperature as follows:
1. Place thermometers in return and supply ducts as close to furnace as possible. Be sure thermometers do not 'see' heat exchangers so that
radiant heat does not affect thermometer readings. This practice is particularly important with straight run ducts.
2. When thermometer readings stabilize, subtract return-air temperature from supply-air temperature to determine air temperature rise.
NOTE: Temperature rise can be determined for low-fire operation by placing setup switch SW-2 on control center in ON position. For high-heat
operation, place setup switch SW-2 in OFF position and jumper R-W2 on control center. DO NOT forget to return setup switch to OFF position
and remove R-W2 jumper upon completion of testing. (See Fig. 31 for switch and terminal location.)
3. This furnace is capable of automatically providing proper airflow to maintain the temperature rise within the range specified on unit rating
plate. If temperature rise is outside this range, proceed as follows:
a. Check gas input for low- and high-heat operation.
b. Check derate for altitude if applicable.
c. Check all return and supply ducts for excessive restrictions causing static pressure greater than 0.5-in. wc.
d. Ensure bypass humidifier switch (BPH) setup switch SW-3 on control center is in ON position when a bypass humidifier is used. (See
Fig. 31 for switch location.)
e. Check Troubleshooting Guide for Variable-Speed 2-Stage Electronic Condensing Furnaces.
C. Set Thermostat Heat Anticipator
The thermostat heat anticipator must be set to match the amp draw of components in the R-W/W1 circuit. Accurate amp draw measurements can
be obtained at the thermostat subbase terminals R and W.
Fig. 59 illustrates an easy method of obtaining thermostat amp draw measurements. The amp reading should be taken after blower motor has started
and furnace is operating in low heat.
1. To operate furnace in low heat, turn setup switch SW-2 to ON position (See Fig. 31.) and connect ammeter leads across thermostat subbase
R-W.
BURNER FLAME
MANIFOLD
Fig. 58—Burner Flame
EXAMPLE:
100,000 Btuh input furnace installed at 4300 ft.
Derate
X
Multiplier
Factor
X
0.91
Table 14—Altitude Derate Multiplier for U.S.A.
PERCENT
OF DERATE
0
4–6
6–8
8–10
10–12
12–14
14–16
16–18
18–20
—56—
BURNER
Furnace Input Rate
=
=
DERATE MULTIPLIER
FACTOR FOR U.S.A.*
1.00
0.95
0.93
0.91
0.89
0.87
0.85
0.83
0.81
A89020
at Installation
Altitude
91,000

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Series f

Table of Contents