Adjust Blower Off Delay (Heat Mode); Set Thermostat Heat Anticipator; Check Safety Controls; Check Primary Limit Control - Bryant D Series Installation, Start-Up, And Operating Instructions Manual

Deluxe 4-way multipoise fixed-capacity direct-vent condensing gas furnace
Table of Contents

Advertisement

TABLE 11—GAS RATE (CU FT/HR)
SECONDS
SIZE OF TEST DIAL SECONDS
FOR 1
1
2
5
REVOLUTION
cu ft
cu ft
cu ft
10
360
720
1800
11
327
655
1636
12
300
600
1500
13
277
555
1385
14
257
514
1286
15
240
480
1200
16
225
450
1125
17
212
424
1059
18
200
400
1000
19
189
379
947
20
180
360
900
21
171
343
857
22
164
327
818
23
157
313
783
24
150
300
750
25
144
288
720
26
138
277
692
27
133
267
667
28
129
257
643
29
124
248
621
30
120
240
600
31
116
232
581
32
113
225
563
33
109
218
545
34
106
212
529
35
103
206
514
36
100
200
500
37
97
195
486
38
95
189
474
39
92
185
462
40
90
180
450
41
88
176
439
42
86
172
429
43
84
167
419
44
82
164
409
45
80
160
400
46
78
157
391
47
76
153
383
48
75
150
375
49
73
147
367
2. When thermometer readings stabilize, subtract return-air
temperature from supply-air temperature to determine air
temperature rise.
3. Adjust temperature rise by adjusting blower speed. Increase
blower speed to reduce temperature rise. Decrease blower
speed to increase temperature rise.
WARNING: Disconnect 115-v electrical power before
changing speed tap. Failure to follow this warning could
result in personal injury.
4. To change blower motor speed selections for heating mode,
remove blower motor lead from control center HEAT
terminal. (See Fig. 25.) Select desired blower motor speed
lead from 1 of the other terminals and relocate it to HEAT
terminal. See Table 12 for lead color identification. Recon-
nect original lead on SPARE terminal.
Follow this same procedure for proper selection of COOL
speed selection.
TABLE 12—SPEED SELECTOR
COLOR
Black
Yellow (When Present)
Blue
Red
White
SIZE OF TEST DIAL
FOR 1
1
2
5
REVOLUTION
cu ft
cu ft
cu ft
50
72
144
360
51
71
141
355
52
69
138
346
53
68
136
340
54
67
133
333
55
65
131
327
56
64
129
321
57
63
126
316
58
62
124
310
59
61
122
305
60
60
120
300
62
58
116
290
64
56
112
281
66
54
109
273
68
53
106
265
70
51
103
257
72
50
100
250
74
48
97
243
76
47
95
237
78
46
92
231
80
45
90
225
82
44
88
220
84
43
86
214
86
42
84
209
88
41
82
205
90
40
80
200
92
39
78
196
94
38
76
192
96
38
75
188
98
37
74
184
100
36
72
180
102
35
71
178
104
35
69
173
106
34
68
170
108
33
67
167
110
33
65
164
112
32
64
161
116
31
62
155
120
30
60
150
FACTORY-
SPEED
SHIPPED
CONNECTION
High
Cool
Medium High
Spare
Medium Low
Heat
Low
Fan
Common
L2
C. Adjust Blower Off Delay (Heat Mode)
If desired, the main blower off time delay period may be
lengthened or shortened when operating in the heating mode to
provide greater comfort. Position shunt jumpers as shown in Table
13 and Fig. 25 for location of switches on control center.
TABLE 13—BLOWER OFF DELAY JUMPER
DESIRED HEATING
MODE BLOWER OFF
DELAY (SEC)
90
135
180
225
D. Set Thermostat Heat Anticipator
Thermostat heat anticipator must be set to match amp draw of
components in R-W circuit. Accurate amp draw measurements can
be obtained at thermostat subbase terminals R and W.
Fig. 51 illustrates an easy method of obtaining these measure-
ments. Amp reading should be taken after blower motor has
started. See thermostat manufacturer's instructions for adjusting
heat anticipator and for varying heating cycle length.
5.0 AMPS ON AMMETER
EXAMPLE:
10 TURNS AROUND JAWS
Fig. 51—Amp Draw Check with Ammeter

CHECK SAFETY CONTROLS

I. CHECK PRIMARY LIMIT CONTROL
This control shuts off combustion control system and energizes
air-circulating blower motor if furnace overheats. Recommended
method of checking this limit control is to gradually block off
return air after furnace has been operating for a period of at least
5 minutes. As soon as limit control has shut off burners, return-air
opening should be unblocked to permit normal air circulation. By
using this method to check limit control, it can be established that
limit is functioning properly and operates if there is a restricted
return-air supply or motor failure. If limit control does not function
during this test, cause must be determined and corrected.
II. CHECK PRESSURE SWITCH
This control proves operation of draft inducer. Check switch
operation as follows:
1. Turn off 115-v power to furnace.
—44—
POSITION
JUMPER POSITION
1-2
2-3
3-4
4-5
THERMOSTAT SUBBASE
TERMINALS WITH
THERMOSTAT REMOVED
HOOK-AROUND
VOLT/AMMETER
R Y W G
10 TURNS
FROM UNIT 24-VOLT
TERMINAL BLOCK
= 0.5 AMPS FOR THERMOSTAT SETTING
A80201

Advertisement

Table of Contents
loading

This manual is also suitable for:

350mav

Table of Contents