Connect the engine wiring harness (coolant stub
•
pipe, throttle position sensor, CO detector, injec-
tors, air cleaner housing).
Attach cable straps (three) at fuel injection rail.
•
Attach wire cables for increased idle speed and
•
throttle operation.
Throttle cable play....................... 0.75 mm (0.03 in)
Install the radiator.
•
1
3
Install the left engine bulkhead (1).
•
Attach cable strap (2).
•
Install fuel line (3).
•
5
6
Install right engine bulkhead (4).
•
Attach cable strap (5).
•
Install coolant line (6) in bulkhead.
•
Install driveline.
•
Install fuel tank.
•
Install radiator surround.
•
Install left and right side sections.
•
Install storage compartment.
•
Install knee pads.
•
2
LT110770
4
LT110780
11.51