Electrolux EOG 600 Instruction Booklet page 38

Electrolux electric oven instruction booklet
Hide thumbs Also See for EOG 600:
Table of Contents

Advertisement

INSTALLATION
FITTING THE APPLIANCE AND CABINET.
1
Make suitable arrangements for gas and electrical supplies into the installation site. Preferably a junction
box or a 3 pin earthed socket should be situated at the back of the cabinet below the oven.
2
Fit cabinet as Fig. 1, making sure that it is level.
3
When unpacking the oven keep it on it's polystyrene base until it is put into the cabinet to avoid damage.
Do not allow young children to play with any part of the packaging.
NOTE: It is imperative that the appliance is left in the base to protect both the appliance and the floor.
4
Remove the oven door. (See section B on page 41).
5
Solid gas pipe installation:
i)
Remove the fascia control panel (see
section A on page 40).
ii)
Slacken and remove the union nut on the
gas supply elbow on the right hand side of
the control panel. See Fig.7.
iii)
Remove the two screws on the gas inlet
block Fig.3.
iv)
Withdraw the gas inlet block and pipe
assembly from the back of the appliance
v)
Remove the union elbow from the inlet block
and pipe assembly. The elbow
required in the final installation.
vi)
The union elbow should be connected to the
gas supply pipe via a standard ¼"B.S.P.
straight connector.
6
Install the gas supply pipe on site complete with
the union elbow (See Fig.4). Note the orientation of the elbow, the connection must be upwards.
7
Position the appliance in front of the cabinet and run the supply cable (See Section 2) through the cabinet
and connect to the junction box or socket. Ensure that the supply is isolated at this stage.
N.B. Two people will be required to carry out the lifting procedure.
Warning: Do not attempt to lift this appliance by the handle.
8
Lift the appliance into the cabinet making sure the gas supply pipe enters the duct in the rear of the
appliance and the cable is not trapped by the appliance. Push the appliance as far back as it will go.
Ensure the supply pipe comes through the control panel and pull through any slack cable.
9
Centralise and fix the appliance to the cabinet using four wood screws in the position indicated in Fig.2.
NOTE: If fitting the cabinet heat deflectors they should be located behind the front frame and secured in
position by the above four wood screws.
10
Tighten the union nut into the supply elbow.
11
Carry out gas soundness check
NOTE: Check supply pressure before fitting fascia (See Section 3).
FIG.4
Solid Pipe Installation
will be
75
38
GAS INLET SUPPLY BLOCK
120
Fig.3
120
225
mm

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents