Verify that the power connector and socket are accessible at all times during the
●
operation of the equipment.
Do not work with power circuits in dimly lit spaces.
●
Do not install this equipment or work with its power circuits during thunderstorms
●
or other weather conditions that could cause a power surge.
Verify there is adequate ventilation around the device, and ambient temperatures
●
meet equipment operation specifications.
Site Preparation
Consult your site survey and network analysis reports to determine specific
●
equipment placement, port capacity, power drops, and so on.
Assign installation responsibility to the appropriate personnel.
●
Identify where all installed components are located.
●
Verify appropriate rack mounting requirements.
●
Provide a sufficient number of power drops for your equipment.
●
Ensure adequate, dust-free ventilation to all installed equipment.
●
Identify and prepare Ethernet and console port connections.
●
Verify that cable lengths are within the maximum allowable distances for optimal
●
signal transmission.
Verify that the Summit WM3400 wireless LAN controller is powered through an
●
Uninterruptible Power Supply (UPS).
Summit WM3400 Wireless LAN Controller Installation Guide
7