Verify that the power connector and socket are accessible at all times during the
operation of the equipment.
Do not work with power circuits in dimly lit spaces.
Do not install this equipment or work with its power circuits during thunderstorms
or other weather conditions that could cause a power surge.
Verify there is adequate ventilation around the device, and ambient temperatures
meet equipment operation specifications.

Site Preparation

Consult your site survey and network analysis reports to determine specific
equipment placement, port capacity, power drops, and so on.
Assign installation responsibility to the appropriate personnel.
Identify where all installed components are located.
Verify appropriate rack mounting requirements.
Provide a sufficient number of power drops for your equipment.
Ensure adequate, dust-free ventilation to all installed equipment.
Identify and prepare Ethernet and console port connections.
Verify that cable lengths are within the maximum allowable distances for optimal
signal transmission.
Verify that the Summit WM3400 wireless LAN controller is powered through an
Uninterruptible Power Supply (UPS).