Chapter 2. Installing Options; Installation Guidelines; System Reliability Guidelines - IBM 88631SU - System x3850 - 8863 Installation Manual

Installation guide
Hide thumbs Also See for 88631SU - System x3850 - 8863:
Table of Contents

Advertisement

Chapter 2. Installing options

This chapter provides basic instructions for installing hardware options in the server.
These instructions are intended for users who are experienced with setting up IBM
server hardware. If you need more detailed instructions, see the User's Guide on
the IBM Documentation CD.

Installation guidelines

Before you begin installing options, read the following information:
v Read the safety information that begins on page v and the guidelines in
v Observe good housekeeping in the area where you are working. Place removed
v If you must start the server while the cover is removed, make sure that no one is
v Do not attempt to lift an object that you think is too heavy for you. If you have to
v Make sure that you have an adequate number of properly grounded electrical
v Back up all important data before you make changes to disk drives.
v Have a small flat-blade screwdriver available.
v You do not have to turn off the server to install or replace hot-swap power
v Blue on a component indicates touch points, where you can grip the component
v Orange on a component or an orange label on or near a component indicates
v When you are finished working on the server, reinstall all safety shields, guards,
v For a list of supported options for the server, see http://www.ibm.com/servers/

System reliability guidelines

To help ensure proper cooling and system reliability, make sure that:
v Each of the drive bays has a drive or a filler panel installed in it.
© Copyright IBM Corp. 2006
"Handling static-sensitive devices" on page 8. This information will help you work
safely.
covers and other parts in a safe place.
near the server and that no other objects have been left inside the server.
lift a heavy object, observe the following precautions:
– Make sure that you stand safely without slipping.
– Distribute the weight of the object equally between your feet.
– Use a slow lifting force. Never move suddenly or twist when you lift a heavy
object.
– To avoid straining the muscles in your back, lift by standing or by pushing up
with your leg muscles
outlets for the server, monitor, and other devices.
supplies, hot-swap fans, hot-plug adapters, or hot-plug Universal Serial Bus
(USB) devices. However, you must turn off the server when performing any steps
that involve installing or removing adapter cables.
to remove it from or install it in the server, open or close a latch, and so on.
that the component can be hot-swapped, which means that if the server and
operating system support hot-swap capability, you can remove or install the
component while the server is running. (Orange can also indicate touch points on
hot-swap components.) See the instructions for removing or installing a specific
hot-swap component for any additional procedures that you might have to
perform before you remove or install the component.
labels, and ground wires.
eserver/serverproven/compat/us/.
7

Advertisement

Table of Contents
loading

This manual is also suitable for:

System x38508863

Table of Contents