F i g u r e 1 - 2 .
V e r s a R a i l s R a c k K i t C o n t e n t s
slide assemblies (2)
Installation Tasks
Installing a rack kit involves performing the following tasks in their numbered order:
Removing the rack doors
1
Marking the rack
2
Installing the slide assemblies in the rack
3
•
RapidRails slide assemblies
•
VersaRails slide assemblies
Installing the system in the rack
4
Installing the cable-management arm
5
Routing cables
6
Replacing the rack doors
7
Removing the Rack Doors
See the procedures for removing doors in the documentation provided with your rack
cabinet.
CAUTION: Because of the size and weight of the rack cabinet doors, never
attempt to remove or install them by yourself.
CAUTION: Store the two doors where they will not injure someone if the doors
accidently fall over.
10-32 x 0.5-inch flange-head
Phillips screws (10)
cable-management arm
stop blocks (2)
status-indicator cable
Rack Installation Guide
1-5